Rev. Date Prepared By AC Power Cog        
  6 5/2/06 Hatcher Baker        
                       
  Feeder Breaker Loads   CBD PRB            
  Breaker TFTR Power Supply Load Status (1=in service, 0=not in service) 50D1,2 Dial setting, 8A, 20ms +10, -0% x Rated, 50/51 Time Dial Setting 50/51 w/94 multiple of setting w/4A tap 50D1 2Acoil Pickup at 1xRated, +5/-0% 50D2 250ms +5/-0% 8A coil 50G 5A coil Inst. +10/-0% 94 or 64 Timer  
  TD= x Rated (sec) x Rated (A) (msec)  
  SV1-01 ETF1-PS-1 1 2.7 1 9.1 6.6 4.6 2 21  
    ETF1-PS-2 1 2.7              
  SV1-02 ETF1-PS-3 0 2.7 1 9.1 6.6 4.6 2 21  
    ETF1-PS-4 0 2.7              
  SV1-03 ETF1-PS-5 0 2.7 1 9.1 6.6 4.6 2 21  
    ETF1-PS-6 0 2.7              
  SV1-04 ETF1-PS-7 0 2.7 1 9.1 6.6 4.6 2 21  
    ETF1-PS-8 0 2.7              
  SV1-05 ETF1-PS-9 0 2.7 1 9.1 6.6 4.6 2 21  
    ETF1-PS-A 0 2.7              
  SV1-06 EEF2-PS-1 1 2.0 1 6.1 6.0 3.0 2 25  
    EEF2-PS-2 1 1.0              
  SV1-07 EEF1-PS-1 1 1.0 1 6.1 6.0 2.0 2 25  
    EEF1-PS-2 1 1.0              
  SV1-08 EOH1-PS-1 1 3.3 1 12.2 6.0 6.1 2 21  
    EOH1-PS-2 1 3.3              
  SV1-09 EOH5-PS-2 1 2.2 1 6.1 6.5 3.1 2 25  
    EOH6-PS-1 1 2.2              
  SV1-12 EOH2-PS-1 1 1.7 1 8.1 6.0 4.1 2 50  
    EOH3-PS-1 1 1.1              
  SV2-01 ETF2-PS-1 1 2.9 1 6.1 3.4 2.5 2 21  
    ETF2-PS-2 1 2.9              
  SV2-02 ETF2-PS-3 1 2.9 1 6.1 3.4 2.5 2 21  
    ETF2-PS-4 1 2.9              
  SV2-03 ETF2-PS-5 1 2.9 1 6.1 3.4 2.5 2 21  
    ETF2-PS-6 1 2.9              
  SV2-04 ETF2-PS-7 1 2.9 1 6.1 3.4 2.5 2 21  
    ETF2-PS-8 1 2.9              
  SV2-05 ETF2-PS-9 0 0.3 1 0.0 0.0 0.0 2 21  
  SV2-06 EEF3-PS-1 1 2.2 1 6.1 6.0 2.0 2 25  
    EEF3-PS-2 1 1.0              
  SV2-07 EEF4-PS-1 1 1.8 1 8.9 6.0 4.5 2 21  
    EEF4-PS-2 1 2.2              
    EFVC-PS-1 0 0.0              
    EHF-PS 0 0.0              
  SV2-08 ETF2-PS-A 0 0.3 1 0.0 0.0 0.0 2 21  
  SV2-09 EOH4-PS-1 1 1.7 1 8.1 6.0 4.1 2 21  
    EOH5-PS-1 1 1.1              
  SV2-12 EOH3-PS-2 1 1.0 1 3.1 6.0 1.0 2 21