1X_960223_CLN_01 |
MINUTES OF MEETING ON WBS 1 |
|
|
|
|
1X_980623_CLN_01 |
POTENTIALS OF MACHINE COMPONENTS |
|
|
|
1X_980923_CLN_01 |
CENTER STACK CASING/OUTER VV ELECTRICAL CONNECTIONS |
|
|
1X_980929_CLN_01 |
PEER REVIEW OF CENTER STACK CASING/OUTER VV ELECTRICAL
CONNECTIONS |
11_010726_CLN_01 |
HEATING POWER AND PULSE LENGTH VS TIME |
|
|
|
11_971029_CLN_01 |
PASSIVE PLATE CONNECTIONS |
|
|
|
|
11_971111_CLN_01 |
MINUTES OF VIDEO CONFERENCE ON PFCS |
|
|
|
11_971117_CLN_01 |
PFC GEOMETRY |
|
|
|
|
|
11_971215_CLN_01 |
FORCES ON PASSIVE PLATES |
|
|
|
|
11_980129_CLN_01 |
PEER REVIEW ON NSTX PLASMA FACING COMPONENTS |
|
|
11_980223_CLN_01 |
FORCES ON INTERNAL HARDWARE |
|
|
|
|
11_980814_CLN_01 |
AWARD OF PFC MACHINING CONTRACT |
|
|
|
13_001006_CLN_01 |
ANALYSIS OF TF RADIAL FLAG – TO – INNER LEG JOINT
MEASUREMENTS |
|
13_001024_CLN_01 |
OH LAUNCHING LOAD AND AXIAL EXPANSION |
|
|
|
13_001108_CLN_01 |
TF AS-BUILT CIRCUIT PARAMETERS |
|
|
|
|
13_001205_AWB_01 |
IMPACT OF LOSS OF COOLANT ON COOL DOWN OF TF COIL INNER LEG |
|
13_001205_CLN_01 |
TF OPERATION WITH COOLING ABSENT FROM TURN 6 |
|
|
13_001206_CLN_01 |
TF OPERATION WITH WATER COOLING ABSENT FROM TURN SIX |
|
|
13_001206_CLN_02 |
TF LIMITS vs. TEMPERATURE |
|
|
|
|
13_001206_PJH_01 |
ANALYSIS FOR NSTX TF CENTER STACK WITH NO ACTIVE COOLING ON
TURN SIX |
13_001208_HMF_01 |
STRESS ANALYSIS OF LOSS OF COOLANT ON COOL DOWN OF TF COIL
INNER LEG |
13_001212_CLN_01 |
TF OPERATION AT 4.5kG WITH WATER COOLING ABSENT FROM TURN 6A |
|
13_001212_CLN_02 |
MINUTES OF MEETING ON EXTENSION OF Ip RANGE TO 1.5MA |
|
|
13_001213_CLN_01 |
TENSILE STRESS ON TF INNER LEG BUNDLE TURN INSULATION |
|
|
13_010111_CLN_01 |
MEETING ON OH GROUND FAULT FINDINGS AND OPTIONS |
|
|
13_010220_CLN_01 |
NEW DESIGN FOR OH GROUND PLANE CONNECTOR |
|
|
13_010222_CLN_01 |
REVISED DESIGN FOR OH GROUND PLANE CONNECTOR |
|
|
13_010226_CLN_01 |
MINUTES OF MEETING ON OH HIPOT LEVEL |
|
|
|
13_010301_CLN_01 |
ANOTHER REVISION TO GROUND PLANE CONNECTOR DESIGN |
|
|
13_010514_CLN_01 |
TF FLAT TOP TIME LIMITATIONS |
|
|
|
|
13_010523_CLN_01 |
TF INNER LEG INSULATION SHEAR STRESS |
|
|
|
13_011126_CLN_01 |
TF OPERATION STARTING 2002 RUN PERIOD |
|
|
|
13_020227_CLN_01 |
NSTX OH CURRENT INCREMENT DUE TO PLASMA DISRUPTION |
|
|
13_021011_CLN_01 |
MINUTES OF MEETING ON TF FLAG JOINTS |
|
|
|
13_021106_CLN_01 |
ALTERNATE TF JOINT DESIGN FOR NSTX |
|
|
|
13_021219_CLN_01 |
VOLTAGE CONSTRAINTS DUE TO ABSORBER COILS |
|
|
13_030220_CLN_01 |
MINUTES OF MEETING ON TF FLAG JOINTS |
|
|
|
13_030224_CLN_01 |
ANALYSIS OF TF FAILURE |
|
|
|
|
13_030227_CLN_01 |
RATED TF PULSE |
|
|
|
|
|
13_030303_CLN_01 |
TF FLAG JOINT FORCES AND LOAD PATHS |
|
|
|
13_030308_CLN_01 |
MINUTES OF MEETING ON TF FLAG JOINTS |
|
|
|
13_030310_CLN_01 |
MINUTES OF 3/10/3 MEETING ON TF FLAG JOINTS |
|
|
|
13_030312_CLN_01 |
MINUTES OF 3/10/3 MEETING ON TF FLAG JOINTS |
|
|
|
13_030318_CLN_01 |
ANALYSIS OF JOINT RESISTANCE MEASUREMENTS |
|
|
13_030512_CLN_01 |
TF INNER LEG ASSEMBLY GROUND INSULATION CRITERIA |
|
|
13_030529_CLN_01 |
TF JOINT VOLTAGE PROBES |
|
|
|
|
13_030626_CLN_01 |
TF AXIAL THERMAL DISPLACEMENT AND SPLINE ACTION |
|
|
13_030630_CLN_01 |
TF FLAG CONNECTIONS |
|
|
|
|
|
13_030701_CLN_01 |
TF CREEPAGE BREAKDOWN TESTS |
|
|
|
|
13_030708_CLN_01 |
HEAT FLOW FROM COPPER TO TORQUE COLLAR |
|
|
|
13_030709_CLN_01 |
OUT OF PLANE LOADS ON TF FLAG |
|
|
|
|
13_030922_CLN_01 |
TF JOINT INSTRUMENTATION |
|
|
|
|
13_030923_CLN_01 |
WORST CASE PF CURRENTS FOR TF LOADING |
|
|
|
13_031002_CLN_01 |
NSTX TF JOINT VOLTAGE DROP SIGNAL PROCESSING REQUIREMENTS |
|
13_031010_CLN_01 |
RESISTIVITY VERSUS CONTACT PRESSURE |
|
|
|
13_031022_CLN_01 |
TF TURN-TURN VOLTAGES |
|
|
|
|
13_031105_CLN_01 |
TF TORQUE COLLAR WET LAY-UP SHEAR STRENGTH |
|
|
13_031106_CLN_01 |
OPTIMIZATION OF CLOCKING OF TF BUNDLE |
|
|
|
13_031110_CLN_01 |
HYSOL MODULUS OF ELASTICITY |
|
|
|
|
13_031113_CLN_01 |
TF TORQUE COLLAR WET LAY-UP SHEAR STRENGTH, REVISED |
|
|
13_031203_CLN_01 |
TF RECOMMISSIONING SEQUENCE |
|
|
|
|
13_031205_CLN_01 |
PF4 AND PF5 FORCES WITH PF4 ENERGIZATION |
|
|
|
13_040106_CLN_01 |
TF AS-BUILT CLOCKING AND WINDING PATTERN |
|
|
|
13_040220_CLN_01 |
ANALYSIS OF TF COMMISSIONING ISTP RESULTS |
|
|
|
13_040225_CLN_01 |
PF1A AND PF1B FORCES AND OPERATING LIMITS |
|
|
|
13_040505_CLN_01 |
PRELIMINARY ANALYSIS OF PF4 ENERGIZATION |
|
|
|
13_040507_CLN_01 |
PF4 & 5 ALLOWABLE CURRENTS WITH EXISTING STRUCTURE |
|
|
13_040510_CLN_01 |
PF1a & PF1b ALLOWABLE CURRENTS |
|
|
|
13_040528_CLN_01 |
2D IN-PLANE ANALYSIS OF TF JOINT |
|
|
|
|
13_041027_CLN_01 |
REVISION TO EM LOADS ON TF FLAGS |
|
|
|
13_041112_FD_01 |
NSTX-PF1a&b Coil Support Analysis |
|
|
|
|
13_041123_CLN_01 |
UPDATE OF NSTX INFLUENCE MATRICIES AND EM LOADS |
|
|
13_041130_CLN_01 |
PF COIL PARAMETER UPDATE |
|
|
|
|
13_041208_CLN_01 |
LOADS ON FLAG BOX/HUB FRICTION INTERFACE |
|
|
|
13_041208_CLN_02 |
RESPONSE TO CHITS FROM FRICTION COATING PEER REVIEW |
|
|
13_050204_CLN_01 |
PRODUCTION TESTING OF POTTED FLAG/BOX ASSEMBLIES |
|
|
13_050406_CLN_01 |
COIL PROTECTION ALGORITHMS IN PSRTC |
|
|
|
13_960320_CLN_01 |
CENTER STACK ELECTRICAL INSULATION AND GROUNDING |
|
|
13_961016_CLN_01 |
ASSUMPTIONS FOR LOAD COMPUTATIONS |
|
|
|
13_961024_CLN_01 |
AXIAL LOAD COMPUTATIONS |
|
|
|
|
13_961029_CLN_01 |
REVISED AXIAL LOAD ASSUMPTIONS |
|
|
|
|
13_970122_CLN_01 |
ANALYSIS OF TF JOINT HEATING |
|
|
|
|
13_970203_CLN_01 |
SUMMARY DESCRIPTION OF OH AND PF COILS |
|
|
|
13_970203_CLN_02 |
PF/OH CURRENT AND VOLTAGE RATINGS |
|
|
|
13_970204_CLN_01 |
PRELIMINARY FMEA OF CENTER STACK |
|
|
|
13_970414_CLN_01 |
REVISED FMEA OF CENTER STACK |
|
|
|
|
13_980106_CLN_01 |
REWORK OF TF BUNDLE OUTER LAYER TURN TO TURN INTERFACE REGION |
|
13_980417_CLN_01 |
COIL ELECTRICAL ALLOWABLES |
|
|
|
|
13_980704_CLN_01 |
OH GROUND PLANE BEHAVIOR |
|
|
|
|
13_980714_CLN_01 |
OH GROUND PLANE REWORK AND GROUNDING CONNECTIONS |
|
|
13_980720_CLN_01 |
OH GROUND PLANE REWORK AND GROUNDING CONNECTIONS |
|
|
13_990223_CLN_01 |
PF COIL ALIGNMENT AND FIELD ERRORS |
|
|
|
13_990727_CLN_01 |
PEER REVIEW ON OH LEAD STEM MODIFICATION |
|
|
|
21_971211_CLN_01 |
PLANNING FOR HHFW ANTENNA PDR |
|
|
|
|
22_010524_CLN_01 |
RECOMMENDATIONS TO ENHANCE RELIABILITY OF CHI |
|
|
22_020507_CLN_01 |
CHI MODELING RESULTS AND RECOMMENDATIONS |
|
|
22_020628_CLN_01 |
TASKS RELATED TO CHI ABSORBER FIELD NULLING SYSTEM |
|
|
22_020801_CLN_01 |
CHI ABSORBER FIELD NULLING COIL DESCRIPTION |
|
|
|
22_020816_CLN_01 |
CHI ABSORBER FIELD NULLING COIL DESCRIPTION, REVISED |
|
|
22_050721_CLN_01 |
HIPOT REQUIREMENTS FOR 1.5KV CHI CAP BANK OPERATION |
|
|
2X_960223_CLN_01 |
MINUTES OF MEETING ON WBS 2 |
|
|
|
|
33_980505_CLN_01 |
CENTER STACK BAKEOUT OHMIC HEATING |
|
|
|
33_991117_CLN_01 |
MINUTES OF MEETING TO DISCUSS UPCOMING OUTER VV BAKEOUT |
|
3X_960223_CLN_01 |
MINUTES OF MEETING ON WBS 3 |
|
|
|
|
4X_960304_CLN_01 |
MINUTES OF MEETING ON WBS 4 |
|
|
|
|
4X_980424_CLN_01 |
RESOLUTION OF PROBLEMS WITH FIRST ARTICLE ROGOWSKI AT AIREX |
|
4X_980424_CLN_02 |
FINAL RESOLUTION OF PROBLEMS WITH FIRST ARTICLE ROGOWSKI AT
AIREX |
4X_980601_CLN_01 |
IP ROGOWSKI REWORK |
|
|
|
|
|
4X_990318_CLN_01 |
FEASIBILITY OF ROGOWSKI MEASUREMENT OF OUTBOARD DIVERTOR
CURRENT |
52_960306_CLN_01 |
PRELIMINARY ANALYSIS OF TF PERFORMANCE |
|
|
|
52_960321_CLN_01 |
TF SHUTDOWN SCENARIOS |
|
|
|
|
53_960522_CLN_01 |
OPTIONS FOR NSTX OH POWER SUPPLY |
|
|
|
53_960605_CLN_01 |
OH THYRISTOR SWITCH CONCEPT DESIGN & COST ESTIMATE |
|
|
53_960606_CLN_01 |
ROBICON POWER SUPPLY PULSE CAPABILITY |
|
|
|
53_960808_CLN_01 |
PRELIMINARY DESIGN OF MONOLITHIC OH COIL |
|
|
|
53_960809_CLN_01 |
ALTERNATE OH COIL DESIGN |
|
|
|
|
53_960906_CLN_01 |
OH COIL OPTIMIZATION |
|
|
|
|
|
53_961212_CLN_01 |
PRELIMINARY OH INITIATION WAVEFORMS |
|
|
|
53_970609_CLN_01 |
SIMULATION OF NSTX PLASMA INITIATION |
|
|
|
53_970609_CLN_02 |
COMPARISON OF SIMULATION CODE WITH CDX-U MEASUREMENTS |
|
54_960520_CLN_01 |
ASSUMPTIONS CONCERNING CHI POWER SUPPLY REQUIREMENTS |
|
55_040206_CLN_01 |
SIMULATION OF RWM/FEC SPA |
|
|
|
|
55_040301_CLN_01 |
SIMULATION OF RWM/FEC SPA, REVISED |
|
|
|
55_040324_CLN_01 |
IE POWER DESIGN REVIEW RESULTS AND RELEASE FOR FABRICTION |
|
5X_960304_CLN_01 |
MINUTES OF MEETING ON WBS 5 |
|
|
|
|
5X_960923_CLN_01 |
IMPLEMENTATION OF NSTX WBS5 AT D-SITE |
|
|
|
5X_960926_CLN_01 |
REVISED ESTIMATE OF OPERATING COSTS AT D-SITE |
|
|
5X_961009_CLN_01 |
REVISIONS TO CONSTRUCTION AND OPERATING COST ESTIMATES WITH
NSTX AT D-SITE |
5X_980112_CLN_01 |
PEER REVIEW ON NSTX TEST CELL & PLATFORM GROUNDING |
|
|
5X_980227_CLN_01 |
PF COIL CONTINUOUS CURRENT CAPACITY |
|
|
|
5X_980806_CLN_01 |
TEST CELL CABLE/WIRING/TRAY DESIGN, MINUTES OF MEETING |
|
6X_960229_CLN_01 |
MINUTES OF MEETING ON WBS 6 |
|
|
|
|
71_000111_CLN_01 |
CENTER STACK UPGRADE |
|
|
|
|
71_000128_CLN_01 |
NSTX VOLTAGE ISOLATION |
|
|
|
|
71_000222_CLN_01 |
OH REP RATE MINIMIZATION, MINUTES OF MEETING |
|
|
71_000302_CLN_01 |
STUDY OF OH COIL COOLING vs. REP RATE |
|
|
|
71_000320_CLN_01 |
EVALUATION OF BAKEOUT OPTIONS |
|
|
|
|
71_000626_CLN_01 |
GROUNDING OF MACHINE COMPONENTS DURING ACCESS |
|
|
71_000731_CLN_01 |
ANALYSIS OF OH WATER OUTLET TEMPERATURE DATA |
|
|
71_030211_CLN_01 |
RESISTIVE WALL MODE SYSTEM SCOPING STUDY |
|
|
|
71_960618_CLN_01 |
COST ESTIMATE VARIANCES AND REDUCTION SCHEMES |
|
|
71_970227_CLN_01 |
STATUS OF NBI REVIEW CHITS |
|
|
|
|
71_970303_CLN_01 |
FINAL DESIGN REVIEW OF CENTER STACK |
|
|
|
71_970421_CLN_01 |
FAR FIELD CALCULATIONS |
|
|
|
|
71_970610_CLN_01 |
GUIDELINES FOR NSTX PROCUREMENTS |
|
|
|
71_970728_CLN_01 |
NSTX & D-SITE CONFIGURATION CONTROL |
|
|
|
71_970729_CLN_01 |
COSTS FOR I&C INTERFACE AND PLASMA CONTROL |
|
|
71_970729_CLN_02 |
NSTX STANDARD DISTRIBUTION LIST |
|
|
|
|
71_970730_CLN_01 |
NSTX AUDIT #9702 FINDINGS |
|
|
|
|
71_970818_CLN_01 |
CHANGE REQUEST CR-003 |
|
|
|
|
71_970820_CLN_01 |
NSTX CONSTRUCTION PLANNING |
|
|
|
|
71_971201_CLN_01 |
CHANGE REQUEST CR-005 |
|
|
|
|
71_971205_CLN_01 |
CLARIFICATION OF NSTX DESIGN REVIEW OBJECTIVES & PROCEDURES |
|
71_980107_CLN_01 |
GUIDELINES RELATED TO THE USE OF MAGNETIC MATERIALS ON NSTX |
|
71_980224_CLN_01 |
HEATING/COOLING INTERFACES |
|
|
|
|
71_980301_CLN_01 |
MINUTES OF HEATING/COOLING INTERFACE MEETING |
|
|
71_980302_CLN_01 |
FIELD AT MIDPLANE |
|
|
|
|
|
71_980326_CLN_01 |
NSTX WBS 611 Process Control System PDR |
|
|
|
71_980921_CLN_01 |
CENTER STACK CASING/OUTER VV ELECTRICAL CONNECTIONS |
|
|
71_981005_CLN_01 |
NSTX TEST CELL VOLTAGE ISOLATION |
|
|
|
72_030203_CLN_01 |
RESISTIVE WALL MODE SYSTEM SCOPING STUDY |
|
|
|
7X_960304_CLN_01 |
MINUTES OF MEETING ON WBS 7 |
|
|
|
|
7X_980210_CLN_01 |
REAL TIME CONTROL FOR FIRST PLASMA |
|
|
|
8X_960229_CLN_01 |
MINUTES OF MEETING ON WBS 8 |
|
|
|
|