1X_960223_CLN_01 MINUTES OF MEETING ON WBS 1
1X_980623_CLN_01 POTENTIALS OF MACHINE COMPONENTS
1X_980923_CLN_01 CENTER STACK CASING/OUTER VV ELECTRICAL CONNECTIONS
1X_980929_CLN_01 PEER REVIEW OF CENTER STACK CASING/OUTER VV ELECTRICAL CONNECTIONS
11_010726_CLN_01 HEATING POWER AND PULSE LENGTH VS TIME
11_971029_CLN_01 PASSIVE PLATE CONNECTIONS
11_971111_CLN_01 MINUTES OF VIDEO CONFERENCE ON PFCS
11_971117_CLN_01 PFC GEOMETRY
11_971215_CLN_01 FORCES ON PASSIVE PLATES
11_980129_CLN_01 PEER REVIEW ON NSTX PLASMA FACING COMPONENTS
11_980223_CLN_01 FORCES ON INTERNAL HARDWARE
11_980814_CLN_01 AWARD OF PFC MACHINING CONTRACT
13_001006_CLN_01 ANALYSIS OF TF RADIAL FLAG – TO – INNER LEG JOINT MEASUREMENTS
13_001024_CLN_01 OH LAUNCHING LOAD AND AXIAL EXPANSION
13_001108_CLN_01 TF AS-BUILT CIRCUIT PARAMETERS
13_001205_AWB_01 IMPACT OF LOSS OF COOLANT ON COOL DOWN OF TF COIL INNER LEG
13_001205_CLN_01 TF OPERATION WITH COOLING ABSENT FROM TURN 6
13_001206_CLN_01 TF OPERATION WITH WATER COOLING ABSENT FROM TURN SIX
13_001206_CLN_02 TF LIMITS vs. TEMPERATURE
13_001206_PJH_01 ANALYSIS FOR NSTX TF CENTER STACK WITH NO ACTIVE COOLING ON TURN SIX
13_001208_HMF_01 STRESS ANALYSIS OF LOSS OF COOLANT ON COOL DOWN OF TF COIL INNER LEG
13_001212_CLN_01 TF OPERATION AT 4.5kG WITH WATER COOLING ABSENT FROM TURN 6A
13_001212_CLN_02 MINUTES OF MEETING ON EXTENSION OF Ip RANGE TO 1.5MA
13_001213_CLN_01 TENSILE STRESS ON TF INNER LEG BUNDLE TURN INSULATION
13_010111_CLN_01 MEETING ON OH GROUND FAULT FINDINGS AND OPTIONS
13_010220_CLN_01 NEW DESIGN FOR OH GROUND PLANE CONNECTOR
13_010222_CLN_01 REVISED DESIGN FOR OH GROUND PLANE CONNECTOR
13_010226_CLN_01 MINUTES OF MEETING ON OH HIPOT LEVEL
13_010301_CLN_01 ANOTHER REVISION TO GROUND PLANE CONNECTOR DESIGN
13_010514_CLN_01 TF FLAT TOP TIME LIMITATIONS
13_010523_CLN_01 TF INNER LEG INSULATION SHEAR STRESS
13_011126_CLN_01 TF OPERATION STARTING 2002 RUN PERIOD
13_020227_CLN_01 NSTX OH CURRENT INCREMENT DUE TO PLASMA DISRUPTION
13_021011_CLN_01 MINUTES OF MEETING ON TF FLAG JOINTS
13_021106_CLN_01 ALTERNATE TF JOINT DESIGN FOR NSTX
13_021219_CLN_01 VOLTAGE CONSTRAINTS DUE TO ABSORBER COILS
13_030220_CLN_01 MINUTES OF MEETING ON TF FLAG JOINTS
13_030224_CLN_01 ANALYSIS OF TF FAILURE
13_030227_CLN_01 RATED TF PULSE
13_030303_CLN_01 TF FLAG JOINT FORCES AND LOAD PATHS
13_030308_CLN_01 MINUTES OF MEETING ON TF FLAG JOINTS
13_030310_CLN_01 MINUTES OF 3/10/3 MEETING ON TF FLAG JOINTS
13_030312_CLN_01 MINUTES OF 3/10/3 MEETING ON TF FLAG JOINTS
13_030318_CLN_01 ANALYSIS OF JOINT RESISTANCE MEASUREMENTS
13_030512_CLN_01 TF INNER LEG ASSEMBLY GROUND INSULATION CRITERIA
13_030529_CLN_01 TF JOINT VOLTAGE PROBES
13_030626_CLN_01 TF AXIAL THERMAL DISPLACEMENT AND SPLINE ACTION
13_030630_CLN_01 TF FLAG CONNECTIONS
13_030701_CLN_01 TF CREEPAGE BREAKDOWN TESTS
13_030708_CLN_01 HEAT FLOW FROM COPPER TO TORQUE COLLAR
13_030709_CLN_01 OUT OF PLANE LOADS ON TF FLAG
13_030922_CLN_01 TF JOINT INSTRUMENTATION
13_030923_CLN_01 WORST CASE PF CURRENTS FOR TF LOADING
13_031002_CLN_01 NSTX TF JOINT VOLTAGE DROP SIGNAL PROCESSING REQUIREMENTS
13_031010_CLN_01 RESISTIVITY VERSUS CONTACT PRESSURE
13_031022_CLN_01 TF TURN-TURN VOLTAGES
13_031105_CLN_01 TF TORQUE COLLAR WET LAY-UP SHEAR STRENGTH
13_031106_CLN_01 OPTIMIZATION OF CLOCKING OF TF BUNDLE
13_031110_CLN_01 HYSOL MODULUS OF ELASTICITY
13_031113_CLN_01 TF TORQUE COLLAR WET LAY-UP SHEAR STRENGTH, REVISED
13_031203_CLN_01 TF RECOMMISSIONING SEQUENCE
13_031205_CLN_01 PF4 AND PF5 FORCES WITH PF4 ENERGIZATION
13_040106_CLN_01 TF AS-BUILT CLOCKING AND WINDING PATTERN
13_040220_CLN_01 ANALYSIS OF TF COMMISSIONING ISTP RESULTS
13_040225_CLN_01 PF1A AND PF1B FORCES AND OPERATING LIMITS
13_040505_CLN_01 PRELIMINARY ANALYSIS OF PF4 ENERGIZATION
13_040507_CLN_01 PF4 & 5 ALLOWABLE CURRENTS WITH EXISTING STRUCTURE
13_040510_CLN_01 PF1a & PF1b ALLOWABLE CURRENTS
13_040528_CLN_01 2D IN-PLANE ANALYSIS OF TF JOINT
13_041027_CLN_01 REVISION TO EM LOADS ON TF FLAGS
13_041112_FD_01 NSTX-PF1a&b Coil Support Analysis
13_041123_CLN_01 UPDATE OF NSTX INFLUENCE MATRICIES AND EM LOADS
13_041130_CLN_01 PF COIL PARAMETER UPDATE
13_041208_CLN_01 LOADS ON FLAG BOX/HUB FRICTION INTERFACE
13_041208_CLN_02 RESPONSE TO CHITS FROM FRICTION COATING PEER REVIEW
13_050204_CLN_01 PRODUCTION TESTING OF POTTED FLAG/BOX ASSEMBLIES
13_050406_CLN_01 COIL PROTECTION ALGORITHMS IN PSRTC
13_960320_CLN_01 CENTER STACK ELECTRICAL INSULATION AND GROUNDING
13_961016_CLN_01 ASSUMPTIONS FOR LOAD COMPUTATIONS
13_961024_CLN_01 AXIAL LOAD COMPUTATIONS
13_961029_CLN_01 REVISED AXIAL LOAD ASSUMPTIONS
13_970122_CLN_01 ANALYSIS OF TF JOINT HEATING
13_970203_CLN_01 SUMMARY DESCRIPTION OF OH AND PF COILS
13_970203_CLN_02 PF/OH CURRENT AND VOLTAGE RATINGS
13_970204_CLN_01 PRELIMINARY FMEA OF CENTER STACK
13_970414_CLN_01 REVISED FMEA OF CENTER STACK
13_980106_CLN_01 REWORK OF TF BUNDLE OUTER LAYER TURN TO TURN INTERFACE REGION
13_980417_CLN_01 COIL ELECTRICAL ALLOWABLES
13_980704_CLN_01 OH GROUND PLANE BEHAVIOR
13_980714_CLN_01 OH GROUND PLANE REWORK AND GROUNDING CONNECTIONS
13_980720_CLN_01 OH GROUND PLANE REWORK AND GROUNDING CONNECTIONS
13_990223_CLN_01 PF COIL ALIGNMENT AND FIELD ERRORS
13_990727_CLN_01 PEER REVIEW ON OH LEAD STEM MODIFICATION
21_971211_CLN_01 PLANNING FOR HHFW ANTENNA PDR
22_010524_CLN_01 RECOMMENDATIONS TO ENHANCE RELIABILITY OF CHI
22_020507_CLN_01 CHI MODELING RESULTS AND RECOMMENDATIONS
22_020628_CLN_01 TASKS RELATED TO CHI ABSORBER FIELD NULLING SYSTEM
22_020801_CLN_01 CHI ABSORBER FIELD NULLING COIL DESCRIPTION
22_020816_CLN_01 CHI ABSORBER FIELD NULLING COIL DESCRIPTION, REVISED
22_050721_CLN_01 HIPOT REQUIREMENTS FOR 1.5KV CHI CAP BANK OPERATION
2X_960223_CLN_01 MINUTES OF MEETING ON WBS 2
33_980505_CLN_01 CENTER STACK BAKEOUT OHMIC HEATING
33_991117_CLN_01 MINUTES OF MEETING TO DISCUSS UPCOMING OUTER VV BAKEOUT
3X_960223_CLN_01 MINUTES OF MEETING ON WBS 3
4X_960304_CLN_01 MINUTES OF MEETING ON WBS 4
4X_980424_CLN_01 RESOLUTION OF PROBLEMS WITH FIRST ARTICLE ROGOWSKI AT AIREX
4X_980424_CLN_02 FINAL RESOLUTION OF PROBLEMS WITH FIRST ARTICLE ROGOWSKI AT AIREX
4X_980601_CLN_01 IP ROGOWSKI REWORK
4X_990318_CLN_01 FEASIBILITY OF ROGOWSKI MEASUREMENT OF OUTBOARD DIVERTOR CURRENT
52_960306_CLN_01 PRELIMINARY ANALYSIS OF TF PERFORMANCE
52_960321_CLN_01 TF SHUTDOWN SCENARIOS
53_960522_CLN_01 OPTIONS FOR NSTX OH POWER SUPPLY
53_960605_CLN_01 OH THYRISTOR SWITCH CONCEPT DESIGN & COST ESTIMATE
53_960606_CLN_01 ROBICON POWER SUPPLY PULSE CAPABILITY
53_960808_CLN_01 PRELIMINARY DESIGN OF MONOLITHIC OH COIL
53_960809_CLN_01 ALTERNATE OH COIL DESIGN
53_960906_CLN_01 OH COIL OPTIMIZATION
53_961212_CLN_01 PRELIMINARY OH INITIATION WAVEFORMS
53_970609_CLN_01 SIMULATION OF NSTX PLASMA INITIATION
53_970609_CLN_02 COMPARISON OF SIMULATION CODE WITH CDX-U MEASUREMENTS
54_960520_CLN_01 ASSUMPTIONS CONCERNING CHI POWER SUPPLY REQUIREMENTS
55_040206_CLN_01 SIMULATION OF RWM/FEC SPA
55_040301_CLN_01 SIMULATION OF RWM/FEC SPA, REVISED
55_040324_CLN_01 IE POWER DESIGN REVIEW RESULTS AND RELEASE FOR FABRICTION
5X_960304_CLN_01 MINUTES OF MEETING ON WBS 5
5X_960923_CLN_01 IMPLEMENTATION OF NSTX WBS5 AT D-SITE
5X_960926_CLN_01 REVISED ESTIMATE OF OPERATING COSTS AT D-SITE
5X_961009_CLN_01 REVISIONS TO CONSTRUCTION AND OPERATING COST ESTIMATES WITH NSTX AT D-SITE
5X_980112_CLN_01 PEER REVIEW ON NSTX TEST CELL & PLATFORM GROUNDING
5X_980227_CLN_01 PF COIL CONTINUOUS CURRENT CAPACITY
5X_980806_CLN_01 TEST CELL CABLE/WIRING/TRAY DESIGN, MINUTES OF MEETING
6X_960229_CLN_01 MINUTES OF MEETING ON WBS 6
71_000111_CLN_01 CENTER STACK UPGRADE
71_000128_CLN_01 NSTX VOLTAGE ISOLATION
71_000222_CLN_01 OH REP RATE MINIMIZATION, MINUTES OF MEETING
71_000302_CLN_01 STUDY OF OH COIL COOLING vs. REP RATE
71_000320_CLN_01 EVALUATION OF BAKEOUT OPTIONS
71_000626_CLN_01 GROUNDING OF MACHINE COMPONENTS DURING ACCESS
71_000731_CLN_01 ANALYSIS OF OH WATER OUTLET TEMPERATURE DATA
71_030211_CLN_01 RESISTIVE WALL MODE SYSTEM SCOPING STUDY
71_960618_CLN_01 COST ESTIMATE VARIANCES AND REDUCTION SCHEMES
71_970227_CLN_01 STATUS OF NBI REVIEW CHITS
71_970303_CLN_01 FINAL DESIGN REVIEW OF CENTER STACK
71_970421_CLN_01 FAR FIELD CALCULATIONS
71_970610_CLN_01 GUIDELINES FOR NSTX PROCUREMENTS
71_970728_CLN_01 NSTX & D-SITE CONFIGURATION CONTROL
71_970729_CLN_01 COSTS FOR I&C INTERFACE AND PLASMA CONTROL
71_970729_CLN_02 NSTX STANDARD DISTRIBUTION LIST
71_970730_CLN_01 NSTX AUDIT #9702 FINDINGS
71_970818_CLN_01 CHANGE REQUEST CR-003
71_970820_CLN_01 NSTX CONSTRUCTION PLANNING
71_971201_CLN_01 CHANGE REQUEST CR-005
71_971205_CLN_01 CLARIFICATION OF NSTX DESIGN REVIEW OBJECTIVES & PROCEDURES
71_980107_CLN_01 GUIDELINES RELATED TO THE USE OF MAGNETIC MATERIALS ON NSTX
71_980224_CLN_01 HEATING/COOLING INTERFACES
71_980301_CLN_01 MINUTES OF HEATING/COOLING INTERFACE MEETING
71_980302_CLN_01 FIELD AT MIDPLANE
71_980326_CLN_01 NSTX WBS 611 Process Control System PDR
71_980921_CLN_01 CENTER STACK CASING/OUTER VV ELECTRICAL CONNECTIONS
71_981005_CLN_01 NSTX TEST CELL VOLTAGE ISOLATION
72_030203_CLN_01 RESISTIVE WALL MODE SYSTEM SCOPING STUDY
7X_960304_CLN_01 MINUTES OF MEETING ON WBS 7
7X_980210_CLN_01 REAL TIME CONTROL FOR FIRST PLASMA
8X_960229_CLN_01 MINUTES OF MEETING ON WBS 8