| 1X_960223_CLN_01 | MINUTES OF MEETING ON WBS 1 | ||||||
| 1X_980623_CLN_01 | POTENTIALS OF MACHINE COMPONENTS | ||||||
| 1X_980923_CLN_01 | CENTER STACK CASING/OUTER VV ELECTRICAL CONNECTIONS | ||||||
| 1X_980929_CLN_01 | PEER REVIEW OF CENTER STACK CASING/OUTER VV ELECTRICAL CONNECTIONS | ||||||
| 11_010726_CLN_01 | HEATING POWER AND PULSE LENGTH VS TIME | ||||||
| 11_971029_CLN_01 | PASSIVE PLATE CONNECTIONS | ||||||
| 11_971111_CLN_01 | MINUTES OF VIDEO CONFERENCE ON PFCS | ||||||
| 11_971117_CLN_01 | PFC GEOMETRY | ||||||
| 11_971215_CLN_01 | FORCES ON PASSIVE PLATES | ||||||
| 11_980129_CLN_01 | PEER REVIEW ON NSTX PLASMA FACING COMPONENTS | ||||||
| 11_980223_CLN_01 | FORCES ON INTERNAL HARDWARE | ||||||
| 11_980814_CLN_01 | AWARD OF PFC MACHINING CONTRACT | ||||||
| 13_001006_CLN_01 | ANALYSIS OF TF RADIAL FLAG – TO – INNER LEG JOINT MEASUREMENTS | ||||||
| 13_001024_CLN_01 | OH LAUNCHING LOAD AND AXIAL EXPANSION | ||||||
| 13_001108_CLN_01 | TF AS-BUILT CIRCUIT PARAMETERS | ||||||
| 13_001205_AWB_01 | IMPACT OF LOSS OF COOLANT ON COOL DOWN OF TF COIL INNER LEG | ||||||
| 13_001205_CLN_01 | TF OPERATION WITH COOLING ABSENT FROM TURN 6 | ||||||
| 13_001206_CLN_01 | TF OPERATION WITH WATER COOLING ABSENT FROM TURN SIX | ||||||
| 13_001206_CLN_02 | TF LIMITS vs. TEMPERATURE | ||||||
| 13_001206_PJH_01 | ANALYSIS FOR NSTX TF CENTER STACK WITH NO ACTIVE COOLING ON TURN SIX | ||||||
| 13_001208_HMF_01 | STRESS ANALYSIS OF LOSS OF COOLANT ON COOL DOWN OF TF COIL INNER LEG | ||||||
| 13_001212_CLN_01 | TF OPERATION AT 4.5kG WITH WATER COOLING ABSENT FROM TURN 6A | ||||||
| 13_001212_CLN_02 | MINUTES OF MEETING ON EXTENSION OF Ip RANGE TO 1.5MA | ||||||
| 13_001213_CLN_01 | TENSILE STRESS ON TF INNER LEG BUNDLE TURN INSULATION | ||||||
| 13_010111_CLN_01 | MEETING ON OH GROUND FAULT FINDINGS AND OPTIONS | ||||||
| 13_010220_CLN_01 | NEW DESIGN FOR OH GROUND PLANE CONNECTOR | ||||||
| 13_010222_CLN_01 | REVISED DESIGN FOR OH GROUND PLANE CONNECTOR | ||||||
| 13_010226_CLN_01 | MINUTES OF MEETING ON OH HIPOT LEVEL | ||||||
| 13_010301_CLN_01 | ANOTHER REVISION TO GROUND PLANE CONNECTOR DESIGN | ||||||
| 13_010514_CLN_01 | TF FLAT TOP TIME LIMITATIONS | ||||||
| 13_010523_CLN_01 | TF INNER LEG INSULATION SHEAR STRESS | ||||||
| 13_011126_CLN_01 | TF OPERATION STARTING 2002 RUN PERIOD | ||||||
| 13_020227_CLN_01 | NSTX OH CURRENT INCREMENT DUE TO PLASMA DISRUPTION | ||||||
| 13_021011_CLN_01 | MINUTES OF MEETING ON TF FLAG JOINTS | ||||||
| 13_021106_CLN_01 | ALTERNATE TF JOINT DESIGN FOR NSTX | ||||||
| 13_021219_CLN_01 | VOLTAGE CONSTRAINTS DUE TO ABSORBER COILS | ||||||
| 13_030220_CLN_01 | MINUTES OF MEETING ON TF FLAG JOINTS | ||||||
| 13_030224_CLN_01 | ANALYSIS OF TF FAILURE | ||||||
| 13_030227_CLN_01 | RATED TF PULSE | ||||||
| 13_030303_CLN_01 | TF FLAG JOINT FORCES AND LOAD PATHS | ||||||
| 13_030308_CLN_01 | MINUTES OF MEETING ON TF FLAG JOINTS | ||||||
| 13_030310_CLN_01 | MINUTES OF 3/10/3 MEETING ON TF FLAG JOINTS | ||||||
| 13_030312_CLN_01 | MINUTES OF 3/10/3 MEETING ON TF FLAG JOINTS | ||||||
| 13_030318_CLN_01 | ANALYSIS OF JOINT RESISTANCE MEASUREMENTS | ||||||
| 13_030512_CLN_01 | TF INNER LEG ASSEMBLY GROUND INSULATION CRITERIA | ||||||
| 13_030529_CLN_01 | TF JOINT VOLTAGE PROBES | ||||||
| 13_030626_CLN_01 | TF AXIAL THERMAL DISPLACEMENT AND SPLINE ACTION | ||||||
| 13_030630_CLN_01 | TF FLAG CONNECTIONS | ||||||
| 13_030701_CLN_01 | TF CREEPAGE BREAKDOWN TESTS | ||||||
| 13_030708_CLN_01 | HEAT FLOW FROM COPPER TO TORQUE COLLAR | ||||||
| 13_030709_CLN_01 | OUT OF PLANE LOADS ON TF FLAG | ||||||
| 13_030922_CLN_01 | TF JOINT INSTRUMENTATION | ||||||
| 13_030923_CLN_01 | WORST CASE PF CURRENTS FOR TF LOADING | ||||||
| 13_031002_CLN_01 | NSTX TF JOINT VOLTAGE DROP SIGNAL PROCESSING REQUIREMENTS | ||||||
| 13_031010_CLN_01 | RESISTIVITY VERSUS CONTACT PRESSURE | ||||||
| 13_031022_CLN_01 | TF TURN-TURN VOLTAGES | ||||||
| 13_031105_CLN_01 | TF TORQUE COLLAR WET LAY-UP SHEAR STRENGTH | ||||||
| 13_031106_CLN_01 | OPTIMIZATION OF CLOCKING OF TF BUNDLE | ||||||
| 13_031110_CLN_01 | HYSOL MODULUS OF ELASTICITY | ||||||
| 13_031113_CLN_01 | TF TORQUE COLLAR WET LAY-UP SHEAR STRENGTH, REVISED | ||||||
| 13_031203_CLN_01 | TF RECOMMISSIONING SEQUENCE | ||||||
| 13_031205_CLN_01 | PF4 AND PF5 FORCES WITH PF4 ENERGIZATION | ||||||
| 13_040106_CLN_01 | TF AS-BUILT CLOCKING AND WINDING PATTERN | ||||||
| 13_040220_CLN_01 | ANALYSIS OF TF COMMISSIONING ISTP RESULTS | ||||||
| 13_040225_CLN_01 | PF1A AND PF1B FORCES AND OPERATING LIMITS | ||||||
| 13_040505_CLN_01 | PRELIMINARY ANALYSIS OF PF4 ENERGIZATION | ||||||
| 13_040507_CLN_01 | PF4 & 5 ALLOWABLE CURRENTS WITH EXISTING STRUCTURE | ||||||
| 13_040510_CLN_01 | PF1a & PF1b ALLOWABLE CURRENTS | ||||||
| 13_040528_CLN_01 | 2D IN-PLANE ANALYSIS OF TF JOINT | ||||||
| 13_041027_CLN_01 | REVISION TO EM LOADS ON TF FLAGS | ||||||
| 13_041112_FD_01 | NSTX-PF1a&b Coil Support Analysis | ||||||
| 13_041123_CLN_01 | UPDATE OF NSTX INFLUENCE MATRICIES AND EM LOADS | ||||||
| 13_041130_CLN_01 | PF COIL PARAMETER UPDATE | ||||||
| 13_041208_CLN_01 | LOADS ON FLAG BOX/HUB FRICTION INTERFACE | ||||||
| 13_041208_CLN_02 | RESPONSE TO CHITS FROM FRICTION COATING PEER REVIEW | ||||||
| 13_050204_CLN_01 | PRODUCTION TESTING OF POTTED FLAG/BOX ASSEMBLIES | ||||||
| 13_050406_CLN_01 | COIL PROTECTION ALGORITHMS IN PSRTC | ||||||
| 13_960320_CLN_01 | CENTER STACK ELECTRICAL INSULATION AND GROUNDING | ||||||
| 13_961016_CLN_01 | ASSUMPTIONS FOR LOAD COMPUTATIONS | ||||||
| 13_961024_CLN_01 | AXIAL LOAD COMPUTATIONS | ||||||
| 13_961029_CLN_01 | REVISED AXIAL LOAD ASSUMPTIONS | ||||||
| 13_970122_CLN_01 | ANALYSIS OF TF JOINT HEATING | ||||||
| 13_970203_CLN_01 | SUMMARY DESCRIPTION OF OH AND PF COILS | ||||||
| 13_970203_CLN_02 | PF/OH CURRENT AND VOLTAGE RATINGS | ||||||
| 13_970204_CLN_01 | PRELIMINARY FMEA OF CENTER STACK | ||||||
| 13_970414_CLN_01 | REVISED FMEA OF CENTER STACK | ||||||
| 13_980106_CLN_01 | REWORK OF TF BUNDLE OUTER LAYER TURN TO TURN INTERFACE REGION | ||||||
| 13_980417_CLN_01 | COIL ELECTRICAL ALLOWABLES | ||||||
| 13_980704_CLN_01 | OH GROUND PLANE BEHAVIOR | ||||||
| 13_980714_CLN_01 | OH GROUND PLANE REWORK AND GROUNDING CONNECTIONS | ||||||
| 13_980720_CLN_01 | OH GROUND PLANE REWORK AND GROUNDING CONNECTIONS | ||||||
| 13_990223_CLN_01 | PF COIL ALIGNMENT AND FIELD ERRORS | ||||||
| 13_990727_CLN_01 | PEER REVIEW ON OH LEAD STEM MODIFICATION | ||||||
| 21_971211_CLN_01 | PLANNING FOR HHFW ANTENNA PDR | ||||||
| 22_010524_CLN_01 | RECOMMENDATIONS TO ENHANCE RELIABILITY OF CHI | ||||||
| 22_020507_CLN_01 | CHI MODELING RESULTS AND RECOMMENDATIONS | ||||||
| 22_020628_CLN_01 | TASKS RELATED TO CHI ABSORBER FIELD NULLING SYSTEM | ||||||
| 22_020801_CLN_01 | CHI ABSORBER FIELD NULLING COIL DESCRIPTION | ||||||
| 22_020816_CLN_01 | CHI ABSORBER FIELD NULLING COIL DESCRIPTION, REVISED | ||||||
| 22_050721_CLN_01 | HIPOT REQUIREMENTS FOR 1.5KV CHI CAP BANK OPERATION | ||||||
| 2X_960223_CLN_01 | MINUTES OF MEETING ON WBS 2 | ||||||
| 33_980505_CLN_01 | CENTER STACK BAKEOUT OHMIC HEATING | ||||||
| 33_991117_CLN_01 | MINUTES OF MEETING TO DISCUSS UPCOMING OUTER VV BAKEOUT | ||||||
| 3X_960223_CLN_01 | MINUTES OF MEETING ON WBS 3 | ||||||
| 4X_960304_CLN_01 | MINUTES OF MEETING ON WBS 4 | ||||||
| 4X_980424_CLN_01 | RESOLUTION OF PROBLEMS WITH FIRST ARTICLE ROGOWSKI AT AIREX | ||||||
| 4X_980424_CLN_02 | FINAL RESOLUTION OF PROBLEMS WITH FIRST ARTICLE ROGOWSKI AT AIREX | ||||||
| 4X_980601_CLN_01 | IP ROGOWSKI REWORK | ||||||
| 4X_990318_CLN_01 | FEASIBILITY OF ROGOWSKI MEASUREMENT OF OUTBOARD DIVERTOR CURRENT | ||||||
| 52_960306_CLN_01 | PRELIMINARY ANALYSIS OF TF PERFORMANCE | ||||||
| 52_960321_CLN_01 | TF SHUTDOWN SCENARIOS | ||||||
| 53_960522_CLN_01 | OPTIONS FOR NSTX OH POWER SUPPLY | ||||||
| 53_960605_CLN_01 | OH THYRISTOR SWITCH CONCEPT DESIGN & COST ESTIMATE | ||||||
| 53_960606_CLN_01 | ROBICON POWER SUPPLY PULSE CAPABILITY | ||||||
| 53_960808_CLN_01 | PRELIMINARY DESIGN OF MONOLITHIC OH COIL | ||||||
| 53_960809_CLN_01 | ALTERNATE OH COIL DESIGN | ||||||
| 53_960906_CLN_01 | OH COIL OPTIMIZATION | ||||||
| 53_961212_CLN_01 | PRELIMINARY OH INITIATION WAVEFORMS | ||||||
| 53_970609_CLN_01 | SIMULATION OF NSTX PLASMA INITIATION | ||||||
| 53_970609_CLN_02 | COMPARISON OF SIMULATION CODE WITH CDX-U MEASUREMENTS | ||||||
| 54_960520_CLN_01 | ASSUMPTIONS CONCERNING CHI POWER SUPPLY REQUIREMENTS | ||||||
| 55_040206_CLN_01 | SIMULATION OF RWM/FEC SPA | ||||||
| 55_040301_CLN_01 | SIMULATION OF RWM/FEC SPA, REVISED | ||||||
| 55_040324_CLN_01 | IE POWER DESIGN REVIEW RESULTS AND RELEASE FOR FABRICTION | ||||||
| 5X_960304_CLN_01 | MINUTES OF MEETING ON WBS 5 | ||||||
| 5X_960923_CLN_01 | IMPLEMENTATION OF NSTX WBS5 AT D-SITE | ||||||
| 5X_960926_CLN_01 | REVISED ESTIMATE OF OPERATING COSTS AT D-SITE | ||||||
| 5X_961009_CLN_01 | REVISIONS TO CONSTRUCTION AND OPERATING COST ESTIMATES WITH NSTX AT D-SITE | ||||||
| 5X_980112_CLN_01 | PEER REVIEW ON NSTX TEST CELL & PLATFORM GROUNDING | ||||||
| 5X_980227_CLN_01 | PF COIL CONTINUOUS CURRENT CAPACITY | ||||||
| 5X_980806_CLN_01 | TEST CELL CABLE/WIRING/TRAY DESIGN, MINUTES OF MEETING | ||||||
| 6X_960229_CLN_01 | MINUTES OF MEETING ON WBS 6 | ||||||
| 71_000111_CLN_01 | CENTER STACK UPGRADE | ||||||
| 71_000128_CLN_01 | NSTX VOLTAGE ISOLATION | ||||||
| 71_000222_CLN_01 | OH REP RATE MINIMIZATION, MINUTES OF MEETING | ||||||
| 71_000302_CLN_01 | STUDY OF OH COIL COOLING vs. REP RATE | ||||||
| 71_000320_CLN_01 | EVALUATION OF BAKEOUT OPTIONS | ||||||
| 71_000626_CLN_01 | GROUNDING OF MACHINE COMPONENTS DURING ACCESS | ||||||
| 71_000731_CLN_01 | ANALYSIS OF OH WATER OUTLET TEMPERATURE DATA | ||||||
| 71_030211_CLN_01 | RESISTIVE WALL MODE SYSTEM SCOPING STUDY | ||||||
| 71_960618_CLN_01 | COST ESTIMATE VARIANCES AND REDUCTION SCHEMES | ||||||
| 71_970227_CLN_01 | STATUS OF NBI REVIEW CHITS | ||||||
| 71_970303_CLN_01 | FINAL DESIGN REVIEW OF CENTER STACK | ||||||
| 71_970421_CLN_01 | FAR FIELD CALCULATIONS | ||||||
| 71_970610_CLN_01 | GUIDELINES FOR NSTX PROCUREMENTS | ||||||
| 71_970728_CLN_01 | NSTX & D-SITE CONFIGURATION CONTROL | ||||||
| 71_970729_CLN_01 | COSTS FOR I&C INTERFACE AND PLASMA CONTROL | ||||||
| 71_970729_CLN_02 | NSTX STANDARD DISTRIBUTION LIST | ||||||
| 71_970730_CLN_01 | NSTX AUDIT #9702 FINDINGS | ||||||
| 71_970818_CLN_01 | CHANGE REQUEST CR-003 | ||||||
| 71_970820_CLN_01 | NSTX CONSTRUCTION PLANNING | ||||||
| 71_971201_CLN_01 | CHANGE REQUEST CR-005 | ||||||
| 71_971205_CLN_01 | CLARIFICATION OF NSTX DESIGN REVIEW OBJECTIVES & PROCEDURES | ||||||
| 71_980107_CLN_01 | GUIDELINES RELATED TO THE USE OF MAGNETIC MATERIALS ON NSTX | ||||||
| 71_980224_CLN_01 | HEATING/COOLING INTERFACES | ||||||
| 71_980301_CLN_01 | MINUTES OF HEATING/COOLING INTERFACE MEETING | ||||||
| 71_980302_CLN_01 | FIELD AT MIDPLANE | ||||||
| 71_980326_CLN_01 | NSTX WBS 611 Process Control System PDR | ||||||
| 71_980921_CLN_01 | CENTER STACK CASING/OUTER VV ELECTRICAL CONNECTIONS | ||||||
| 71_981005_CLN_01 | NSTX TEST CELL VOLTAGE ISOLATION | ||||||
| 72_030203_CLN_01 | RESISTIVE WALL MODE SYSTEM SCOPING STUDY | ||||||
| 7X_960304_CLN_01 | MINUTES OF MEETING ON WBS 7 | ||||||
| 7X_980210_CLN_01 | REAL TIME CONTROL FOR FIRST PLASMA | ||||||
| 8X_960229_CLN_01 | MINUTES OF MEETING ON WBS 8 | ||||||