Logbook entriesAfter 0.5s metals up to 1 on Metals Zeff. SPRED showed pronounced metallic bulge: 100-400Å. This was occuring during the collapse of the plasma. At normal time (0.3s) O5 = C3, N4 80% of C3, Ar15 90% of C3. ------------ spaul XP 1067 BOLOMETRY Aug 02 2010 Intense central accumulation of impurities after .55 sec. Central power density jumps to .55 MW/m^3 and metals Zeff exceeds 1 at .59 sec. ------------ adiallo XP 1067 PHYS OPS Aug 02 2010 Changed beam timing A: 40:150 ms and 300:1100ms ON Early beam timing of B dropped: 350:1100 ms C:400:110 ms. Shot went through but the beam timing was not right. Need to repeat. ------------ |