(Help on these pages)
(List all pages)
Grade: B
Logbook entries180 degree antenna phasing settings from shot 141917 Helium discharge with Ip = 900 kA Bt = 4 kG Requesting 350 kW/source for 200-500 ms Got 1.9 MW with trips, a little better than last shot First trip was on locked mode ------------ dbattagl XP 1036 SESSION LEADER Oct 15 2010 Lower density, lower TF to 4kG Result: Still no LH Next: Go back to 4.5kG, start li powder dropper, increase fueling, increase RF power ------------ adiallo XP 1030 PHYS OPS Oct 15 2010 Drop TF to 4.1 kG Further reduce the LFS gas. No effects on the L-H transistion ------------ |
(times in microseconds:)
Return to the GPI page
         
Go to Web Tools
If you have questions or comments on this data, please send email to szweben or bdavis.