(Help on these pages)
(List all pages)
Grade: B
Logbook entriesHollow Prad profile steadily buuilding up to about .5 MW of total power. Central metals Zeff about .05 on average. ------------ dbattagl XP 1036 SESSION LEADER Oct 15 2010 Early density still way too low, get LH during Ip ramp. Next: Try one more time for increase in early density ------------ adiallo XP 1030 PHYS OPS Oct 15 2010 Increasing LFS Still low density early on ------------ gtaylor XP 1036 RF Oct 15 2010 180 degree antenna phasing settings from shot 141917 Deuterium discharge with Ip = 900 kA Bt = 4.5 kG Some helium added on this shot Requesting 200 kW/source for 200-500 ms with RF waveform from 141917 0.5 Prf for 50 ms, then Prf for rest of pulse Lithium powder before this shot Got trip early during short 0.5 Prf (550 kW) then one trip during Prf (1.1 MW) phase ------------ GPI CommentsNote that blobs before peak are inside Sep and those after are outside ------------ |
(times in microseconds:)
Return to the GPI page
         
Go to Web Tools
If you have questions or comments on this data, please send email to szweben or bdavis.